HomeCase Studies › Blind precision dumping using DGPS…

Blind precision dumping using DGPS for a pipeline crossing on the River Wye in the UK

Blind precision dumping using DGPS for a pipeline crossing on the River Wye in the UK

DGPS equipment was used for precision dumping of protective material alongside the underwater pipeline, without damaging the pipeline.

River erosion had exposed a high-pressure pipeline, which if left unchecked could have resulted in failure with an inevitable environmental impact.

The solution came through adapting high precision DGPS equipment, which provides accurate, real-time positing information.

‹ Back to Case Studies